Marina South Station DSM Project

Marina South Station DSM Project


Project Profile

Name: Marina South Station DSM Project

Location: Marina South,Singapore

Method: Deep Soil Mixing(DSM)

Construction duration

From: 12/2017

To: 02/2018

Marina South MRT Station DSM Project construct  φ1.50m x 1.20m center twin column deep soil mixing (DSM). The construction area is a commercial center with many restrictions and requirements.After treatment, the design requirements are met.