Changi T5 CR102 DSM Project

Changi T5 CR102 DSM Project


Project Profile

Name: Changi T5 CR102 DSM Project

Location: Changi T5

Method: Deep soil mixing

Construction duration

From: 08/2022

To: 12/2024

 

The Singapore Cross Island Line Phase I Project (CR102 Section) was undertaken by the Land Transport Authority of Singapore and the main contractor was a consortium consisting of Shanghai Tunnel Engineering Co., Ltd. (Singapore) and LT Sambo Co., Ltd. Geoharbour Singapore Branch undertook the deep cement mixing project for Zone 1, Zone 2 and Zone 3 of CR102 Section, with a maximum pile diameter of 1.75m and a maximum depth of more than 45m. There were many hard layers, and the project was very challenging, but Geoharbour Singapore achieved the goal excellently.