Changi T5 CR102 DSM Project
Project Profile
Name: Changi T5 CR102 DSM Project
Location: Changi T5
Method: Deep soil mixing
Construction duration
From: 08/2022
To: 12/2024
The Singapore Cross Island Line Phase I Project (CR102 Section) was undertaken by the Land Transport Authority of Singapore and the main contractor was a consortium consisting of Shanghai Tunnel Engineering Co., Ltd. (Singapore) and LT Sambo Co., Ltd. Geoharbour Singapore Branch undertook the deep cement mixing project for Zone 1, Zone 2 and Zone 3 of CR102 Section, with a maximum pile diameter of 1.75m and a maximum depth of more than 45m. There were many hard layers, and the project was very challenging, but Geoharbour Singapore achieved the goal excellently.