Ayer Merbau Phase 2 Marine PVD Project
Project Profile
Name: Prefabricated Vertical Drains(Marine PVD)
Location: Jurong Island,Singapore
Method: Marine Prefabricated Vertical Drains(Marine PVD)
Construction duration
From: 03/2018
To:07/2018
Ayer Merbau Phase 2 Marine PVD Project use GPS systems to pinpoint coordinates to control barge movement Automatic recording system(s) was incorporated in the installation process of the PVDs in order to to confirm the actual depth of installation. The position of the drains, depth of penetration, joints, mandrel used for installation was recorded throughout the installation process.