Tekong Island Pilot Trial Phase 2 Project

Tekong Island Pilot Trial Phase 2 Project


Project Profile

Name: Tekong Island Pilot Trial Phase 2

Location: Tekong Island,Singapore

Method: Pilot Trial

Construction duration

From: 10/2016

To: 12/2022

 

Singapore Tekong Island Pilot Trial Phase 2 is a project jointly carried out by Shanghai Geoharbour Singapore Branch and the National University of Singapore(NUS), including cement bearing layer, containment bund and 10 different construction methods. It is a green experimental project to treat urban river silt and meet the design and use requirements.