Yangzhou Heavy Steel Structure, China Railway Baoji Bridge Group

The ground of 260,000 m2 warehouse and road was treated with different control parameters of HVDM. The cost was saved by more than 30%, and the construction period was 90 days, thus meeting the design requirements after testing.